1 Client represented
Fort Hills South Pit Dedicated Disposal Area (SPDDA)
SPDDA Polymer Hydration Plant (PHP) (AB)
Feb 2021 – Apr 2022
Engineering Manager and Senior Project Engineer
• Led the engineering and project services teams to complete the FEED and DED of an 8.5 t/hr dry polymer hydration plant.
• Led the overall technical completion of the polymer hydration plant and integration with the overall mine site in the Detailed Engineering Design (DED) and Procurement phase.
• Managed the client, drove design and procurement, and approved IFC drawings for equipment, modularized buildings, silos and tanks.
• Managed procurement packages and the initial development of the construction interface.
• Technical interface manager with Fort Hills and Wood PLC, chaired all internal and client technical, schedule and progress meetings.