Paul Turk’s project experienced comes from both salaried and consulting roles. Please visit out PORTFOLIO OF CLIENTS & EMPLOYERS section on the homepage for more information.

TransCanada PipeLines (TCPL) - Metering Station Expansions 2017 – 2018

Sep 2017 – Feb 2018

Project Location(s): AB/ON, Canada
Office location(s): Calgary, AB

Role: Senior Project Engineer

 

Competed three TCPL meter station expansions at western Canadian sites, and assisted with the ATCO expansion program for three sites in East/Central Canada.

Managed the detailed engineering design teams and created IFC packages for the fabrication and construction of metering building skids, instrument building skids, u/g & a/g pipe lines and tie-ins, and earthworks.

Resolved numerous tubing layout issues in the buildings, piping stress issues on buried natural gas pipe lines, vessel interface issues on skids.

Cenovus - Foster Creek Casing Gas De-Bottlenecking, 2018 – 2018

Sep 2017 – Feb 2018

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Senior Project Engineer

 

Developed IFC Construction Work Packages from Civil, Piping, Glycol Heat Tracing and Insulation drawings, and from Client standards and specifications, for the early works field tie-ins.

CNRL - Preliminary SAGD Wellpad Estimate 2017 – 2017

Jun 2017 – Jul 2017

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer

 

Led the development of the CNRL SAGD Wellpad Class 2 Estimate project. Subsequently awarded the detailed E&P for new pads in western Canada (confidential sites).

Developed the detailed TIC estimate, basis and MTO by leading the multi-disciplined engineering design team and by coordinating inputs and scope with the Client's team.

Kinder Morgan - BTT Baseline Tank Terminal Expansion Project, 2015 – 2017

Dec 2015 – Feb 2017

Project Location(s): Edmonton, AB, Canada
Office location(s): Calgary, AB

Role: Area Project Manager

 

Managed the engineering design, procurement, and scheduling for the KMCT Baseline Tank Terminal (BTT) greenfield expansion project ($700M, 5M bbls storage, 700 kbbls/d transfer).

Lead the project’s engineering & procurement design firm (Wood PLC., formerly Amec Foster Wheeler - Three Streams Division) in the crude blending area, crude transfer booster pumps, three metering modules and five valve manifold modules, facility pipe rack modules, e-house area buildings, surge relief system, U&O, and pipe rack interfaces to the Trans Mountain PipeLine terminal and the KMC Rail Loading facility.

Chaired scheduling and procurement meetings with the construction, commission and procurement teams to align schedules and keep the construction workforce on track with material supply.

Responsible for major equipment packages. Responsible for completion of HAZOPs, pipeline transients and hydraulic analysis, tank heating designs, U&O facilities, and the design interface between BTT and the proposed KMC Trans Mountain Expansion Pipeline project.

Interfaced with numerous third-party storage facility design teams along “Pipeline Alley” in Edmonton, AB, to interconnect BTT with numerous existing brownfield terminal tie-ins.

Murphy Oil – Gas Plants and Well Pad MOC Projects, 2014 – 2015

Nov 2014 – Oct 2015

Project Location(s): BC/AB, Canada
Office location(s): Calgary/Edmonton, AB, Richmond, BC

Role: Project Manager

 

Managed the preliminary engineering and procurement activities for 6 sustaining capital projects (<$1M ea), the detailed engineering for 5 construction projects (~$100k ea), the detailed engineering of multiple replacement-in-kind gas plant and well pad projects (~$25k ea), and the multidisciplinary completion of several gas plant and process studies.

Managed intermediate Project Engineers and multidisciplinary engineering teams in numerous offices (Calgary, Edmonton, Richmond) in the detailed engineering of 5 major sustaining gas plant projects in BC, and 5 MOC gas plant and well pad projects (completing 7 IFC EWPs) in AB.

The facilities were in the Tupper Area of northern BC.

 

 

CQ Energy (Centrica) - Gas Gathering Areas MOC Projects, 2014 – 2015

Nov 2014 – Oct 2015

Project Location(s): BC/AB, Canada
Office location(s): Calgary, AB

Role: Project Manager

 

Managed a small, nimble team of engineers & drafters to complete IFC MOC projects, numerous replacement-in-kind and small operations projects for gas gathering areas and processing plants located at Cochrane, Medicine Hat and Stettler, AB.

Our small team consisted of part-time (borrowed) engineers from the process, piping, electrical/comm and mechanical departments. Completed my own document control transmittals, schedules, budgets and project controls reports.

 

 

JACOS - Hangingstone SAGD Expansion Project, 2013 – 2014

Dec 2013 – Oct 2014

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Senior Project Engineer

 

Responsible for the modular fabrication of engineered buildings and wellpad injector skids for Japan Canada Oil Sands (JACOS) SAGD Expansion project in Northern Alberta.

Managed two Edmonton-based fabrication contractors in the construction of 6 well pad process buildings, 19 well control skid modules, 6 well pad steam letdown modules, and 4 pipeline drain station modules. Interfaced with the senior wellpad and senior pipeline project engineers to coordinate design changes, and with project controls departments to track progress and budgets.

 

 

TAQA - Oil Shale Mine Conceptual Study, 2013 – 2013

Jun 2013 – Dec 2013

Project Location(s): Morocco
Office location(s): Calgary, AB

Role: Senior Project Engineer and Engineering Services Manager

 

Coordinated the FEL1 execution of the conceptual study phase of a proposed Oil Shale to Liquids mine, shale retort and hydrocarbon processing plant, using proprietary shale capsule technology, in north Africa producing approximately 15,000 bbl/day of hydrocarbon liquids.

Directly responsible for execution planning, defining scope, updating commercial terms and finance systems, manhour planning, resource planning, scope execution, project controls services, document control services, quality control services, and chairing international client meetings regarding mining scope, ore processing, refining and utility services.

TAQA - Gas To Liquid (GTL) Feasibility Study, 2013 – 2013

Jan 2013 – Aug 2013

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Senior Project Engineer and Engineering Services Manager

 

Led the execution planning and setup for the FEL3 feasibility and basic engineering phase of a proposed CAD $2B Fischer-Tropsch Gas to Liquids (GTL) plant in western Canada.

Directly responsible for the coordination of the following tasks with the Project Manager and Engineering Manager: execution planning, defining scope, updating commercial terms and finance systems, manhour planning, resource planning, scope execution, project controls services, document control services and quality control service.

 

 

TAQA - Gas To Liquid (GTL) Pre-Feasibility Study, 2012 – 2013

May 2012 – Jan 2013

Project Location(s): BC/AB/SK/MN/ON, Canada
Office location(s): Calgary, AB

Role: Project Engineer and Engineering Services Manager

 

Coordinated the FEL2 pre-feasibility evaluation and optimization of selected Fischer-Tropsch GTL technology licencors, preferred site plot planning, engineering advancement, cost estimating and further economic modeling and market analysis for the proposed GTL plant in western Canada to produce diesel and naphtha.

Directly responsible for project set-up, project execution and close-out with all engineering and project services staff. Coordinated the schedules, tasks and deliverables of personnel in multiple offices from various technical disciplines and project services. Accountable for manhour, financial budgets, forecasts, and for the development and administration of the change management program and associated contract change management system.

Interfaced with the Engineering Manager to facilitate project completion and communication between all technical personnel and all project services staff. Developed scope, schedule and budgets for technical personnel, ensure that work and progress on the project satisfies the client's expectations and maintain compliance with all project execution procedures associated with the study. Managed personnel and tasks related to IT and network services, financial systems, commercial contracts, procurement, document management, quality control, risk management and project controls. Chaired weekly technical meetings, weekly client meetings and make monthly presentations of progress and project management summaries to the client.

Velocys - Gas To Liquid (GTL) Reactor Development Study, 2011 – 2012

Oct 2011 – Feb 2012

Project Location(s): Ohio, USA
Office location(s): Calgary, AB

Role: Project Manager

 

Managed personnel in the development of reactor process operating guidelines, reactor installation guidelines and a mechanical design evaluation of a proprietary micro-channel Fischer-Tropsch (FT) gas to liquids (GTL) cobalt catalyst reactor fabricated in the US for global clients.

Supervised the development of operating guidelines that summarized the process parameters and other critical engineering and safety systems. Coordinated Senior Mechanical Engineers, Structural Engineers and Constructability Specialists from multiple Hatch offices on the development of a reactor installation guideline. Developed the schedule, budgets and execution plan, and led the interface meetings with the Hatch and client teams. Responsible for inter-discipline design review coordination, document management systems and quality control services, health and safety of personnel traveling to the client's design and testing facilities, and for delivery and presentation of the final guideline to Velocys.

Supervised the evaluation of an alternative reactor configuration. Led and coordinated a senior mechanical engineering team from multiple Hatch offices to make alternative design and manufacturing recommendations, to evaluate alternative materials of construction, and to propose testing equipment and procedures for internal reactor components.

TAQA - Gas To Liquid (GTL) Conceptual Study, 2011 – 2012

Mar 2011 – Feb 2012

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer

 

Coordinated the FEL1 conceptual evaluation of multiple Fischer-Tropsch GTL technology licencors, site selection, engineering, cost estimating, economic modeling and market analysis for a proposed GTL plant in western Canada.

Directly responsible for project execution, risk management, document management services, quality control services, reporting, schedules, manhour and financial budgets and all other project control services. Coordinated the schedules, tasks and deliverables of personnel in multiple offices from various technical disciplines and project services. Facilitated commercial and financial services with the development of contracts, confidentiality agreements and project invoicing.

TOTAL - Joslyn North Mine Projectm, 2010 – 2011

Sep 2010 – Apr 2011
Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer

Facilitated a major project execution program with Hatch Project Management for a large, multi-contractor design team on the FEL3 basic engineering design of an oil sands mine, ore preparation area, haul roads, ponds and stream relocation near Fort McKay, Alberta.

Developed project delivery strategies and procedures and led the development of the Mine Engineering Execution Plan. Defined the early work scope of work for mine planning execution and facilitated the development of the early works portion of design and mine planning by coordinating multi-discipline teams. Led the creation of all early works issued-for-tender dossiers containing the engineering work packages for procurement of construction bid estimates. Led the development of the construction execution schedule basis for the early works scope. Managed the Hatch construction and procurement representatives in developing the early works contract compensation strategy.

Chaired weekly meetings with the client’s Project Management team, Hatch’s Project Management and Engineering Leads and the sub-contracted geotechnical consultants. Facilitated meetings between teams to progress the technical integration of the civil and geotechnical designs of the mine. Developed and managed the RFI program to remove barriers in design and schedule. Managed the engineering field visit program for Hatch and sub-contracted staff to safely conduct site investigations.

Red Leaf - Oil Shale Commercial Demonstration Project, 2010 – 2010

Aug 2010 – Oct 2010

Project Location(s): Utah, USA
Office location(s): Calgary, AB

Role: Project Engineer

 

Coordinated interoffice teams (Mississauga, Calgary) of civil engineers and mechanical/furnace technology engineers. Advanced the FEL2/3 basic engineering design of an oil shale mine, proprietary oil shale roasting furnace technologies and extraction plant, and associated oil upgrading facilities proposed in the northwest US.

Initiated the project execution plan, refined manhour estimates and resource plans and produced specific work plans and procedures for Hatch’s multi-office execution of this project. Chaired the client design meetings between Red Leaf and Hatch regarding the constructability, staged construction sequencing and the material handling plan for oil shale in-situ oil extraction capsules.

SNF Floquip - EOR (Enhanced Oil Recovery) injector skid packages, 2010 – 2010

Jan 1010 – May 2010

Project Location(s): AB/SK, Canada
Office location(s): Andrezieux, France / Riceboro, Georgia, USA / Calgary, Alberta, Canada

Role: Project Engineer

 

Managed client design requirements and providing reservoir polymer injection equipment to well pads. Coordinated engineering and fabrication of EOR oil reservoir injection equipment for deployment in western Canadian oil fields.

Managed scope and designs between third-party engineering representatives for clients (Pengrowth, Penwest, Black Pearl, Husky, CNRL) and SNF Engineering/Fabrication.

Shell Canada - Shell Scotford Upgrader Expansion 1, 2006 – 2009

May 2006 – May 2009

Project Location(s): Fort Saskatchewan, AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer and Technical Coordinator

 

Directed battery limit interfaces via multi-office execution, and managed the design between the process units engineered in Calgary, Edmonton, Toronto, Houston and India. Coordinated Bantrel multi-discipline design interfaces with 3rd party utilities and pipelines to develop interconnection scopes, tie-ins and schedules. Managed scope, schedule, cost and quality of the interface scope, and led teams to remove issues and achieve all design milestones dates.

Coordinated multi-contractor design work for Shell on various $1M to $50M debottlenecking, retrofit or tie-in projects on the existing base plant and chemical plant. Managed over 50 major planning, design and procurement issues and closeout programs recognized to be in risk of creating schedule and construction delays. Chaired client interface meetings between senior members and discipline leads of the client’s and Bantrel's teams. Chaired construction interface meetings with the client, Bantrel Engineering and Bantrel Construction Company during the concurrent engineering and construction of the utilities and offsite plant section of the Upgrader.

Received Bantrel recognition awards for the resolution of engineer holds lists, construction work package coordination, and for conducting multi-office design and coordination meetings between the client, contractor and design teams. Received a Shell recognition award for coordinating an innovative piping design between multi-contractor engineer teams, which resulted in a $700,000 design saving.

Contributed to the timely completion of HAZOPs, 3D-model reviews, cost and scope trends, constructability reviews, squad checking, quality audits, change management, P&ID reviews, lessons learned and client design reviews. Delegated meeting issues as necessary, and followed-up on commitments to ensure the client’s measurable progress expectations for cost, quality and schedule were met, or exceeded.

UFA | Petroleum - Capital construction & upgrades program, 2002 – 2006

Apr 2002 – May 2006

Project Location(s): BC/AB/SK, Canada
Office location(s): Calgary, AB

Role: Project Manager

 

Directly responsible for the design and construction of 10 major projects totaling nearly $20 M, over 20 substantial projects totaling nearly $10 M and over 50 facility upgrades, each under $0.25 M. Completed over 50 business development plans to propose new facilities or expansions. Prepared and presented over 80 petroleum site layouts and capital budgets to corporate management for the acquisition of new capital funding. Liaised with regional management on new market opportunities.

Designed upgrades to existing petroleum facilities or construction of new facilities, completed capital and construction cost estimates, created design, construction and procurement schedules, and performed constructability reviews for planned work. Completed permit applications and liaised with all provincial and municipal authorities. Performed field inspections to verify construction quality, engineer design, equipment quality and installation and facility commissioning. Updated as-built construction drawings and drawing standards.

Managed teams of province-wide, multi-discipline design consultants and their respective budgets for design services. Led the vendor, consultant and contractor pre-qualification program, and controlled bid openings and reviews. Managed and administered construction project execution contracts, managed equipment supply contracts with vendors, and managed the equipment tendering program. Wrote, managed and administered all purchase orders, in conjunction with the noted construction, consultant or supply contracts. Approved and tracked all invoices associated with the noted purchase orders. Reported on the progress of all contracts and financial commitments to the director of engineering.

Shell Canada - Retail/Commercial upgrades & maintenance program, 1997 – 2003

May 1997 – Apr 2003

Project Location(s): BC/AB/SK/MN/ON, Canada
Office location(s): Calgary, AB

Role: Project Engineer and Inspector

 

Consulted for Shell Canada Limited, Various Fuel Facility Upgrade Projects.

Represented the Shell Project Managers with fuel facility upgrades across Canada at approximately 50 facilities. Performed field inspections to verify construction, design, equipment quality and installation. Oversaw replacement and maintenance of retail and commercial underground and above ground tanks, dykes, pumps, lines and fuel dispensers.

Managed the dispenser conversion program for Shell's national roll-out of the Ultra Diesel Product in 2003.

UFA | Petroleum - Capital constriction expansion program, 2002 – 2003

May 2002 – Apr 2003

Project Location(s): BC/AB/SK, Canada
Office location(s): Calgary, AB

Role: Project Engineer

 

Consulted for United Farmers of Alberta, Various Fuel Facility Upgrade Projects.

Completed project planning, standards development and capital estimates. Assisted the UFA Project Manger with maintenance and upgrades to existing retail, commercial and bulk facilities across Alberta.

Innovatively updated the existing engineering design standards to incorporate new materials and technologies that were not utilized in the existing petroleum network. Improved the accuracy of the capital estimating program, and decreased costs in the first year by inviting new equipment vendor and construction contractors.

Shell Canada - HSE auditor, retail/commercial facility inspector, 1998 – 2002

May 1998 – Sep 2002

Project Location(s): Alberta, Canada.
Office location(s): Calgary, AB

Role: Project Engineer and Retail and Commercial Facility Auditor

 

Consulted for Shell Canada and Turbo Resources , Various Fuel Facility Upgrade Projects.

Traveled to approximately 100+ Shell and Turbo retail and commercial facilities in Alberta and British Columbia to train staff on Shell’s health, safety and environmental policies, complete fuel inventory audits, complete operational performance audits of each station, complete facility standards audits and recommended facility upgrades. Assisted the retail and commercial engineers in Alberta with fuel system component upgrades and maintenance programs.

Petro-Canada - Commercial facility upgrade & maintenance program, 1998 – 2002

Jan 1998 – Jan 2002

Project Location(s): BC/AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer

 

Consulted for Petro-Canada, Various Fuel Facility Upgrade Projects.

Supported the Petro-Canada Senior Commercial Engineer by preparing equipment and contract purchase orders, releasing equipment to construction contractors across western Canada and reporting on project costs.

Assisted the Senior Commercial Engineer by supervising maintenance programs on commercial and bulk facilities in western Canada for tank replacements, dike and liner repairs, oil-water separator upgrades and fuel system upgrades.

Komex - Underground storage tank removal program, 1997 – 1998

Oct 1997 – Feb 1998

Project Location(s): AB, Canada
Office location(s): Calgary, AB

Role: Project Engineer

 

Consulted for Komex International, Various Fuel Facility Upgrade Projects.

Assisted multiple Komex Project Managers with project tasks related to tank removal, installation and reporting at commercial facilities in southern Alberta.

ZLC - Underground storage tank installation inspection program, 1997 – 2002

Apr 1997 – Apr 2002

Project Location(s): BC/AB/SK/MN/ON, Canada
Office location(s): Calgary, AB

Role: Field Engineer and Inspector

 

Consulted for ESSO, Petro-Canada, Shell Canada, Fas Gas, Save On Foods, 7-11, Macs, Super Store, Overwaitea, Safeway, Husky, Federated Co-op and multiple Independent fuel distributors.

Represented clients' Project Managers on multiple fuel tank and line upgrades across Canada. Performed field inspections to verify the equipment installation per the manufacturer’s instruction to validate the fuel system warranty. Provided equipment installation validation reports to the client and insurance underwriters.